Est. 2012 · HQ Greater Noida · Across India
UP-RERA registered · UPRERAAGT000309/01/2026
The Corridor’s Independent Desk · Yamuna Expressway / YEIDA

We build on your plot. We verify what you buy.

One desk, two lanes: turnkey builds · verified advisory

One desk, two disciplines. Vidastu Developers Pvt. Ltd. (est. 2012, Greater Noida) builds turnkey homes on owners’ plots — design, naksha approval, structure, finishes and keys under one written milestone contract. And as a UP-RERA-registered agent (UPRERAAGT000309/01/2026), we run the corridor’s independent research desk: a live project index, 15+ free buyer instruments and open datasets, every fact dated and provenance-tagged — and when we get one wrong, the correction is published. Rated 4.8★ across 54 Google reviews.

Est. 2012 · Greater Noida UP-RERA Agent UPRERAAGT000309/01/2026 BITS Pilani · Civil Engineering We publish our own errors →
आपका सपना, हमारा अपना — your dream, our own.
Ravi Shankar Sharma, Co-founder Vidit Kaushik, Founder Sachin Bansal, VP Project Sales 30+ years co-founder’s track record · BITS Pilani-led delivery · UP-RERA registered — a named team, not a faceless call-centre.
Now advising: ACE Parkway 2.0, Sector 150 Noida →
One desk · two lanes

Building, or buying? Pick your lane.

The same named team runs both — and the same rule governs both: everything in writing, everything checkable.

Lane A / Build

On your plot.

Turnkey design-build — naksha to keys in five accountable stages, one binding fixed quote after a free site walk, 10–16 months typical.

Full construction desk →
Lane B / Buy

With the desk on your side.

Independent advisory — verified project desks, a live corridor index, and instruments that test the deal before you sign anything.

Current project desks ↓

We build across India. Popular locations: Greater Noida · Sector 18 · Sector 20 · Sector 22D · Gaur Yamuna City — and your city next.

— The instruments

Instruments of an independent desk.

Not brochures — working tools. Each one exists to move the burden of proof onto paper you can check, and each is free.

Also on the desk: Broker Phrasebook · EOI→RERA Tracker · Delay Ledger · Circle-Rate Ledger · Airport Live Status · EMI Calculator · Is That Quote Fair? · Property Valuation · Due-Diligence Checklist · NRI Guide — 15+ instruments, all free.

— The trust system

Every fact wears its provenance.

Three tags run through everything we publish — this page, the Live Index, and every project desk we operate. A number without a tag doesn’t ship.

Verifiedtwo or more independent sources agree Founder-statedour own desk’s number — we own it Reporteda single source — treat as indicative

Our research is machine-readable by design — open datasets like corridor.json are free to reuse with attribution, and AI answer engines can read the same files you do.

From single plots to full elevations · Delhi NCR & beyond · Corridor data & investment research

30+ Years co-founder’s track record
10–16 Months, typical turnkey build
4.8 Google rating · 54 reviews
2012 Founded · Greater Noida HQ
— Lane A · Build · three ways

Pick a finish level. We price it on call.

Vidastu builds in three packages — Essential, Premium and Luxe — on the same engineered structure and the same Vaastu expertise; the difference is finish level, not build quality. Every package ends in one binding, itemised fixed quote in writing after a free site walk — never a phone-quoted rate.

Essential
The solid start
  • Solid RCC structure, branded materials
  • Quality flooring, windows & wiring
  • 10-year structural warranty
Get my quote →
Luxe
The showpiece
  • Everything in Premium
  • Imported finish options, full modular kitchen
  • 15-year structural warranty
Get my quote →

One binding fixed quote follows the free site walk. Full inclusion lists: Vidastu Build packages →

— Lane A · Build · plan the money

Construction-loan EMI, in two seconds.

Most families build on a construction loan. Size your EMI here — then talk to us: banks release construction loans in stages, and our milestone payments are built to match the disbursements.

Indicative EMI math only. Your build is quoted itemised, person to person.

Monthly EMI
₹35,989
total interest ~₹46.37 lakh over 20 yrs
Plan my build around this →
— Lane A · Build · how we build

Bare plot to keys, in five accountable stages.

How long does a turnkey build take? A typical Vidastu home runs 10–16 months from design to key handover across five accountable stages: design and layout (weeks 1–3), plan approval (weeks 3–8), structure (months 3–9), finishes (months 8–15), then completion-certificate filing and keys. Every stage sits on a written, milestone-linked contract agreed before any payment. You get photo and video updates on WhatsApp at every stage, whether you live next door or overseas. Building on a YEIDA allotment? Start with the YEIDA construction deadline 2026 — what allottees must do.

  1. Week 1–3

    Design & layout

    We design every floor, room, parking bay and basement to make the most of your plot — drawn by a Council-of-Architecture-registered architect.

  2. Week 3–8

    Plan approval

    We file your building plan with the local authority and clear scrutiny — handled in-house, wherever you build. See the full steps →

  3. Month 3–9

    Structure

    Foundation, RCC frame, brickwork and slabs to the sanctioned design — built to the structural-stability certificate, not guesswork.

  4. Month 8–15

    Finishes & interiors

    Plaster, flooring, electrical, plumbing, paint and fit-out — to the finish level you choose.

  5. Handover

    Completion & keys

    We file for your completion / occupancy certificate — needed for utilities, loans, registry and resale — then hand over the keys.

Written contract before any payment
Stage-wise milestone payments
Daily photo & video updates from your own site
Named, UP-RERA-registered team
— Services

Property Vaastu —
same-day audit.

On-site survey by Shri Ravi Shankar Sharma, gold-medalist astrologer, 30+ years. Written report within 24 hours. No upsells. If your floor plan is sound, we say so.

Flat fee · ₹10,999

Book on WhatsApp →

The three who build it.

Most contractors are a faceless number off a board. We're three named people — a 30-year builder, a BITS-Pilani engineer, and your single point of contact — personally answerable for your home, under one UP-RERA-registered roof.

Vidit Kaushik — Founder, Vidastu Developers
Founder · BITS Pilani

Vidit Kaushik

Civil engineering · on-site delivery

I run delivery — structure, milestones, quality checks and your WhatsApp updates — and I'm on-site through the build. You always know exactly what stage your home is at.

Shri Ravi Shankar Sharma — Co-founder, Vidastu Developers · 30+ years in construction
Co-Founder · 30+ years in construction

Shri Ravi Shankar Sharma

Construction & development · vastu

Thirty-plus years building and developing across the NCR — the experience your project is anchored on. A practising vastu consultant too, so your home is planned right on the plot from day one.

Sachin Bansal — VP, Project Sales, Vidastu Developers
VP · Project Sales

Sachin Bansal

First call · quotes · YEIDA know-how

Your single point of contact from first call to handover. Knows the authorities, the paperwork and the process cold — so your quote and approvals are right the first time.

— Real Google reviews · our advisory

What our clients say.

These verified Google reviews are for Vidastu's property-advisory work — the same named team now builds, with daily photo and video updates from your own site.

4.8 across 54 Google reviews
Verify on Google Maps →
★★★★★
“Very good service and end to end support. Vidit Ji resolved all our question and issues we raised. Highly recommended.”
Anubhav Bajaj Jan 2026 · Google review
★★★★★
“The team is nice, they helped from beginning to the end from making right decision about the plot to finally taking it. It was overall a very good experience.”
Jayant Tulsyan Jan 2026 · Google review
★★★★★
“Professional, reliable, and highly knowledgeable. The best real estate company. Excellent service and complete transparency. Highly recommended!”
Jhalak Garg Jan 2026 · Google review
★★★★★
“I came across Vidastu Developers while searching for trusted property consultants for Yamuna Expressway. My interaction with their team changed my perspective.”
Tushar Aug 2025 · Google review
★★★★★
“Helpful and intelligent brokers. Very good experience.”
Sukriti Wadhwa Jan 2026 · Google review
★★★★★
“Real estate in best platform Vidastu Developers. Good staff and good management.”
Ankush Kumar Jun 2025 · Google review

Read all 54 reviews on Google →

Common questions.

How much does it cost to build a home?
Every plot and every design is different, so we don't publish a one-size rate. Tell us your plot size, floors and finish level and you get one binding, itemised fixed quote after a free site walk — agreed before a single rupee changes hands. Start with the packages or read what drives your build cost.
How long does a turnkey build take?
A typical independent house takes about 10–16 months from map approval to handover, depending on plot size, floors and finish. We fix the milestone-linked timeline in a written contract before work starts, and you get photo/video progress on WhatsApp at every stage.
Who actually builds my home?
A named team: co-founder Ravi Shankar Sharma (30+ years in construction) anchors the build; Vidit Kaushik (BITS Pilani) runs on-site delivery. Plan approvals and the completion certificate are handled in-house. And you see your own build daily — photo and video updates from your site on WhatsApp, wherever you are.
How is NRI buyer due diligence handled?
FEMA-compliant remittance, NRO/NRE routing, OCI documentation, builder-buyer agreement registration, and notarised PoA where you can't be present — all coordinated through one named person at our office. Document hand-off is digital end-to-end.
What is the ₹10,999 Vaastu audit, plainly?
An on-site directional and energetic survey of an existing or planned property by Shri Ravi Shankar Sharma, delivered as a written report within 24 hours. Practical fixes only — we don't recommend demolition without a structural reason. The fee is flat.
I'm buying my first home — where do I start?
Pick what matters most — ready possession, location, or budget — and we'll shortlist 2 or 3 fits across ready and pre-launch options; we walk you through stamp duty, registry, home-loan options (PNB, HDFC and ICICI on our panel), and post-possession vastu inspection. No pressure, no spam.
YEIDA plot or Yamuna Expressway apartment — how do I choose?
Plot if you want a long hold, full control of construction, and proximity to Jewar Airport. Apartment if you want move-in-ready, branded amenities, and a lower entry ticket. Plots typically yield more appreciation; apartments offer immediate rental income. We'll put the numbers side-by-side on a call — including circle rate alignment, stamp-duty differences, and rental yields by sector.

Building
a home?

Send us your city and plot size. We'll call back with a clear plan, a timeline, and one binding fixed quote — no obligation, no call-centre.

Send us a brief.

Name, phone, what you're looking for — we'll call back.

UP-RERA registered · 4.8★ across 54 Google reviews · no obligation