Home · Projects · Gulshan Empire

Now reviewing · Wave City, Ghaziabad · NH-24

Gulshan Empire, the Gulshan Group’s new project, reviewed.

The Gulshan Group’s pre-launch at Wave City, Ghaziabad, on NH-24 — read the way an independent, UP-RERA desk reads it, not the way a brochure writes it.

Gulshan Empire in one look: 3 BHK + SR (2,075 sq ft saleable) and 4 BHK + SR (2,750 sq ft saleable) at Wave City, Sector 1, NH-24 Ghaziabad — indicative from ~₹1.98 Cr*. RERA UPRERAPRJ166511/05/2026, completion date on the register 12-02-2031. Floor-plan detail and the payment schedule come from the sales desk in writing. For the project's own dedicated site — EOI status, current price band and visit booking — see gulshansempire.com.

Ask the desk

The dated cost sheet and the floor plans come from a person, not a download. Send two lines and you get them in writing.

Ask on WhatsApp Call +91 98114 05300

~₹1.98 Cr*3 BHK + SR start
6 × G+31Towers
≈496–500Residences
Dec 2030Possession (tentative)

4.8 across 58 Google reviews as on 6 October 2026 · UP-RERA agent UPRERAAGT000309/01/2026 · CIN U68200UP2023PTC192378

Navratri offer, 11 to 19 October 2026: this Navratri the Vaastu is on us. Every site visit booked through Vidastu Advisory in the window includes a free Vaastu consultation with Shri Ravi Shankar Sharma, and every apartment booked through us in the window includes his one-hour consultation for your new home, listed at ₹11,000 all-inclusive. Both by live video for buyers abroad, and for site visits booked a day ahead we send a car both ways from anywhere in Delhi NCR. Full terms. Claim it on WhatsApp 98114 05300.

Gulshan Empire, Wave City, in September 2026.

Gulshan Empire’s project RERA is UPRERAPRJ166511/05/2026 (as filed by the developer). The two configurations are 3 BHK + SR (2,075 sq ft) from ~₹1.98 Cr* and 4 BHK + SR (2,750 sq ft) from ~₹2.62 Cr*, indicative pre-launch figures that move with the EOI window, not RERA-published prices; confirm the current sheet with the desk before relying on them. The payment plan follows a CLP structure with milestones. The current price list and the full cost sheet both come from our desk on WhatsApp, in writing.

In one paragraph

What Gulshan Empire actually is.

Gulshan Empire is a pre-launch 3 & 4 BHK + servant-room luxury project by Gulshan Empire Estate LLP — an entity of the Gulshan Group — at Plot GH-2B, Sector 1, Oak Wood Enclave, Wave City, Ghaziabad 201015. It is the group’s first Ghaziabad project after three decades on the Noida belt. Project RERA: UPRERAPRJ166511/05/2026 (as filed by the developer). 5.56 acres · 6 towers · G+31 · approx. 496–500 homes · no 2 BHK. Indicative pricing: 3 BHK + SR from ~₹1.98 Cr*, 4 BHK + SR from ~₹2.62 Cr* (~₹10,500/sq ft base; charges and GST extra). This page is Vidastu Developers’ independent buyer-advisory review. For the deepest coverage — itemized pricing, floor plans, RERA walkthrough, FAQ and blog — see gulshansempire.com, run by our sister brand Vidastu Advisory (an authorised channel partner, not the developer’s official site).

~₹1.98 Cr*
3 BHK + SR Start
6 × G+31
Towers
≈496–500
Residences
5.56 ac
Site (22,504 sq m)
2 only
Configurations
~4,200 ac
Wave City Township
NH-24
Direct Frontage
Dec 2030
Possession (tentative)

Why we cover it

Why Vidastu features Gulshan Empire — our first Ghaziabad pick.

Our shortlist has so far lived on the Yamuna Expressway / Greater Noida corridor — Eldeco Echoes of Eden, Gaur Yamuna Expressway, SKA Destiny One. Gulshan Empire is the first Ghaziabad project to make the cut, for four reasons:

  1. RERA filing is on record. UPRERAPRJ166511/05/2026 (as filed by the developer; promoter UP-RERA ID UPRERAPRM435155) — verifiable at up-rera.in. Many “new project Wave City” listings circulating online are EOI collections with no registration to point to; this one has a filing you can check.
  2. A 35-year developer lineage entering a new corridor. The Gulshan Group (founded 1989, Gulshan Nagpal) built its record in Noida and Greater Noida West — Dynasty, Botnia, Ikebana, Bellina, One29. Gulshan Empire is the group’s Ghaziabad debut, and developers tend to defend their brand hardest on a debut.
  3. Genuinely low density for the ticket. Approx. 496–500 homes on 5.56 acres with only two configurations — no studio/2 BHK mix. In a corridor where most launches push unit count, a two-config luxury slab is a deliberate positioning choice.
  4. Wave City’s infrastructure is already real. The ~4,200-acre township (IGBC pre-certified Platinum) has operational schools (DPS Wave City among them), in-township retail, and direct NH-24 frontage. You are buying into infrastructure that exists, with Jewar-airport optionality on top.

The promoter, on record

Gulshan Group’s new project — what “Empire” actually is.

Searches for “Gulshan new project” and “Gulshan Group new project” in 2026 lead here: Gulshan Empire at Wave City, Ghaziabad. The promoter entity is Gulshan Empire Estate LLP (LLPIN ACF-3850, incorporated 7 Feb 2024), an entity of the Gulshan Group. Key verified facts:

ProjectGulshan Empire (pre-launch, luxury residential)
PromoterGulshan Empire Estate LLP — an entity of the Gulshan Group (founded 1989 by Gulshan Nagpal)
AddressPlot GH-2B, Sector 1, Oak Wood Enclave, Wave City, Ghaziabad, UP 201015
Project RERAUPRERAPRJ166511/05/2026 (as filed by the developer) · verify at up-rera.in
Scale5.56 acres (22,504 sq m) · 6 towers · G+31 · approx. 496–500 homes
Configurations3 BHK + SR — 2,075 sq ft · 4 BHK + SR — 2,750 sq ft (super/saleable area) · no 2 BHK
PossessionExpected Dec 2030 (tentative) · RERA-filed completion 12 Feb 2031

Full sourced fact sheet with confidence labels: gulshansempire.com/facts.

The price

What is the Gulshan Empire price?

Gulshan Empire’s 3 BHK + Servant Room (2,075 sq ft) starts from ~₹1.98 Cr* and the 4 BHK + Servant Room (2,750 sq ft) from ~₹2.62 Cr*, at an indicative base of ~₹10,500/sq ft. There is no 2 BHK. *Indicative — confirm the current sheet: these are pre-launch figures, not RERA-published prices, and they move with the EOI window. Areas below are super/saleable, not carpet — always confirm RERA carpet area from the UP-RERA filing before booking.

ConfigurationArea (super, sq ft)Indicative base rateIndicative entry price*
3 BHK + Servant Room2,075~₹10,500/sq ftfrom ~₹1.98 Cr*
4 BHK + Servant Room2,750~₹10,500/sq ftfrom ~₹2.62 Cr*

*Indicative pre-launch figures, not RERA-published prices. Add PLC, floor-rise, parking, club and other charges, plus GST and UP stamp duty/registry for the all-in cost — the dated sheet with every rate comes from our desk on WhatsApp, in writing. Limited early-bird pricing on select units — request the current EOI rate.

What does the Gulshan Empire cost sheet actually contain?

The headline ₹1.98 Cr* is the base selling price and nothing else — eight further heads sit between it and the cheque you write. We are not going to publish rupee figures for those heads on a public page, because pre-launch charge schedules move and a stale number costs a buyer real money. What we can do is name every line so you know exactly what to ask the desk for, and so you can tell a complete sheet from a partial one.

Cost headWhat it isWhere the figure comes from
Base selling priceRate × super area — the number in the headlinePublished above
Preferred-location chargePremium for facing, corner or park-side positionDesk sheet, in writing
Floor-risePer-floor premium up a G+31 tower — material at this heightDesk sheet, in writing
Car parkingCovered parking, charged per bayDesk sheet, in writing
Club membershipOne-time charge for clubhouse accessDesk sheet, in writing
Power backupUsually charged per kW of sanctioned loadDesk sheet, in writing
IFMS / maintenance corpusInterest-free deposit, plus advance maintenance at possessionDesk sheet, in writing
GSTStatutory, on an under-construction purchaseStatutory rate — verify the rate current on your booking date
Stamp duty & registrationStatutory, paid to the UP government, not the developerUP government schedule for Ghaziabad

Use it as a checklist. A cost sheet that names all nine heads with figures against each is a real one; a WhatsApp message with a single crore figure and no breakdown is a quote, not a cost sheet, and it is the commonest way corridor buyers get surprised at the agreement stage. Two heads deserve particular attention at Gulshan Empire specifically: floor-rise, because a G+31 tower has a long way to climb and the premium compounds every floor, and stamp duty, because it is charged on the agreement value rather than the base price, so it rises with everything above it. Ask for the sheet in writing, ask for it to be dated, and check it against the register before you pay anything.

Get the current EOI rate & cost sheet

Configuration-wise indicative pricing · PLC and floor-rise table · payment-plan structure · all-in worked example. Vidit sends it on WhatsApp within minutes (office hours).

Layouts

Are Gulshan Empire floor plans available?

Not as a public download — unit layouts for Gulshan Empire are shared by the sales desk in writing, on request, and we do not publish them here. What is on the record and quotable today is the shape of the offer: two configurations only, a 3 BHK + servant room at 2,075 sq ft saleable and a 4 BHK + servant room at 2,750 sq ft saleable, with no 2 BHK anywhere in the project, across six G+31 towers on a 5.56-acre site holding roughly 496 to 500 homes.

That distinction matters more than it might sound. A saleable area tells you what you are billed for; only the layout drawing tells you how that area is actually distributed — where the servant room sits relative to the kitchen, how much of the number is balcony, whether the third bedroom takes an external wall. At a pre-launch stage those drawings are still being finalised against the sanctioned plan, which is exactly why a project that hands out a “final” layout too early usually ends up handing out a second one later.

So when you ask us for plans, ask for three things in the same message: the layout for the configuration you want, the RERA carpet area stated on it, and the date the drawing was issued. Those three together are what let you compare Empire honestly against anything else you are weighing, and they are what our desk sends. Everything on this page about areas is saleable, not carpet — confirm carpet against the UP-RERA filing (UPRERAPRJ166511/05/2026) before you commit.

Verify before you pay

What is the Gulshan Empire RERA number?

Gulshan Empire’s RERA number is UPRERAPRJ166511/05/2026 (as filed by the developer, Gulshan Empire Estate LLP). Promoter UP-RERA ID: UPRERAPRM435155. Verify it on up-rera.in before any payment. This is a real, searchable registration — not a pending or EOI-only listing. The RERA-filed completion date is 12 February 2031; expected possession is December 2030 (tentative).

How to verify in 60 seconds: go to up-rera.in → search “Gulshan Empire” or paste the registration number → confirm the promoter entity is Gulshan Empire Estate LLP and the address is Plot GH-2B, Sector 1, Oak Wood Enclave, Wave City, Ghaziabad. A step-by-step walkthrough with screenshots is at gulshansempire.com/gulshan-empire-rera/.

Never book a pre-launch property without confirming RERA registration yourself. The registration number is the minimum; also confirm the escrow account is live (RERA mandates 70% of receipts into an escrow).

Timeline

When is Gulshan Empire possession?

Expected possession is December 2030 (tentative); the RERA-filed completion date is 12 February 2031 under UPRERAPRJ166511/05/2026. At pre-launch stage, plan to the RERA filing — not verbal promises — since only the filed date carries delay-penalty protection under the RERA Act 2016.

Two practical implications. First, budget your horizon to early 2031: rental income or self-use begins only at possession, so Empire is a 5–7 year commitment from a 2026 booking. Second, track delivery through the UP-RERA portal’s quarterly progress reports rather than sales-office updates — escrow drawdowns (70% of receipts, milestone-certified) are the honest construction signal. If you need keys before 2030, see the buyer-fit table below and explore delivered availability instead.

Empire vs Dynasty

Gulshan Empire vs Gulshan Dynasty — the key differences.

Short answer: Gulshan Dynasty is a delivered IGBC Platinum-rated project in the Noida / Greater Noida West belt. Gulshan Empire is the Gulshan Group’s new pre-launch project — a different city (Ghaziabad, NH-24), a different stage, and a different buyer horizon. They share a developer brand; they are not competing with each other.

Gulshan EmpireGulshan Dynasty
StatusPre-launch (RERA filed: UPRERAPRJ166511/05/2026)Delivered — an established Gulshan Group project
LocationWave City, Ghaziabad — NH-24 (NH-9) corridorNoida / Greater Noida West corridor
Developer entityGulshan Empire Estate LLP (an entity of the Gulshan Group)Gulshan Group (same parent)
Green ratingNot yet disclosed — verify on RERA portalIGBC Platinum
PossessionDec 2030 tentative · RERA-filed completion 12 Feb 2031Delivered (possession already handed)
Buy if…You want a new-launch unit, Wave City township, 5–7 yr horizonYou need immediate possession / prefer the Noida side (buy resale)

All Dynasty facts sourced from the existing page context — verify Dynasty RERA/details at up-rera.in. Vidastu advises on Empire; for Dynasty resale, ask Vidit for a referral.

What’s confirmed, what isn’t

Gulshan Empire amenities — what we know (and what to verify).

Gulshan Empire’s club and amenity schedule was not officially published on the UP-RERA portal at the time of this review. Vidastu does not publish unverified amenity lists — promises at pre-launch stage are not contractually binding until they appear in the RERA-registered plan. What to do:

The township layer

Wave City Ghaziabad — the township context.

Wave City is a ~4,200-acre master-planned township on NH-24 (officially NH-9), the Delhi–Meerut Expressway corridor, and is IGBC pre-certified Platinum. For a buyer evaluating any new project in Wave City, the township layer matters as much as the project layer:

Deeper corridor analysis: the Wave City Ghaziabad guide at gulshansempire.com.

Location

Where exactly is Gulshan Empire?

Gulshan Empire is at Plot GH-2B, Sector 1, Oak Wood Enclave, Wave City, NH-24, Ghaziabad, UP 201015 — this is Ghaziabad, not Noida. The project sits inside the ~4,200-acre Wave City township with direct NH-24 (NH-9) / Delhi–Meerut Expressway frontage: 6 towers, G+31, approx. 496–500 homes on 5.56 acres. The distances below are measured from the Wave City gates.

DestinationDistance (approx.)Route / note
NH-24 / Delhi–Meerut ExpresswayDirect frontageThe township’s primary access
Eastern Peripheral Expressway (NE-2)Interchange at DasnaTo Greater Noida, Yamuna Expressway, Faridabad — bypassing Delhi
Noida Sector 62 / 63 (IT hubs)~16–18 kmVia NH-24 / NH-9
Indirapuram (Shipra cluster)~13–15 kmSchools, retail, dining
Anand Vihar, east Delhi~20–22 kmAlong the Delhi–Meerut Expressway
Ghaziabad RRTS station (Namo Bharat)~8–10 kmDelhi–Ghaziabad–Meerut corridor, fully operational
Hindon Airport (domestic)~15–18 kmNearest operational airport
IGI Airport, Delhi~45 km~60–75 min off-peak
Noida International Airport, Jewar~60–70 kmOperational (commercial flights began June 2026) · via DME → EPE → Yamuna Expressway

Distances approximate, by road; expect ±2–3 km depending on the Wave City gate used. We state distances, not drive-time marketing claims.

The competitive field

Gulshan Empire vs the real Wave City field.

First, the rumour-control that buyers searching “new project Wave City” need: as of mid-2026, “M3M Wave City” and “Godrej Wave City” are not RERA-registered Ghaziabad projects — M3M has no Ghaziabad project on file, and “Jade County” belongs to the County Group. The real comparison set:

Gulshan EmpireGaur (NYC / Saviour)SKA DivineWave Veridia / Eden / Eligo
PositioningLuxury, two configs onlyLarge-scale township premiumMid-premiumDeveloper’s own availability
Configurations3 & 4 BHK + SR onlyWider mixWider mixWider mix
Indicative rate~₹10,500/sq ftVerify current rates on portals / RERA — corridor average ~₹8,027/sq ft (Mar 2026, SquareYards)
RERAUPRERAPRJ166511/05/2026 (as filed)Verify each on up-rera.in before comparing

Gulshan Empire prices above the corridor average — that premium buys lower density, larger units, and the Gulshan brand. Whether that trade is worth it depends on your horizon; see the buyer-fit table below. Detailed head-to-heads: vs Gaur · vs SKA Divine · vs County Jade · the M3M rumour, checked.

Reading the layout

Vastu & engineering notes.

Vastu: official unit-level floor plans for Gulshan Empire had not been publicly released at the time of this review, so — unlike our Eldeco EOE page — we are not publishing a floor-plate Vastu verdict yet. General guidance for a 6-tower G+31 layout applies (prefer East/North-East-facing units; treat South-West-corner entries with care), and Shri Ravi Shankar Sharma, our co-founder and senior Vastu consultant, will review the official plates when released. For unit-specific guidance before EOI, book a Property Vaastu pre-purchase audit (₹11,000).

Engineering (Vidit Kaushik, Civil Engineer, BITS Pilani): at 5.56 acres / 6 towers / G+31 and ~89–90 homes per acre, Empire sits at the lower-density end of the corridor’s high-rise launches. The two-configuration slab (2,075 / 2,750 sq ft + SR) simplifies the structural grid and typically improves carpet-efficiency consistency across floors — verify the RERA-disclosed carpet ratio (the 3 BHK carpet is approx. 1,142 sq ft per the RERA mirror) before booking. RERA’s escrow regime (70% of receipts) applies as with every registered project.

Who it’s for

Buyer profile fit — who Empire is for, who it isn’t.

Buyer profileEmpire fitWhy
End-user upgrading within Ghaziabad / east NCR✓ Strong fitLarge 3/4 BHK + SR, low density, township schools already operational
Investor, 5–7 year hold✓ Reasonable fitNH-24 corridor with RRTS operational; entry at a premium to the corridor average is the risk to price in
NRI buyer✓ Good fitFEMA-compliant routes, PoA remote booking; RERA filing to verify from abroad
Buyer needing a 2 BHK / sub-₹1.5 Cr ticket✗ SkipNo 2 BHK exists at Empire; consider other Wave City availability
Buyer needing possession before 2030✗ SkipPre-launch; RERA-filed completion is 12 Feb 2031
Yield-now investor✗ SkipNo rental income until possession, and no page here publishes a yield for this corridor

FAQ

Questions we get about Gulshan Empire.

What is Gulshan Empire?
Gulshan Empire is a pre-launch luxury residential project at Wave City, Ghaziabad by Gulshan Empire Estate LLP — an entity of the Gulshan Group (founded by Gulshan Nagpal, 1989). 5.56 acres · 6 towers · G+31 · approx. 496–500 homes · 3 & 4 BHK + SR only. Project RERA UPRERAPRJ166511/05/2026 (as filed by the developer).
Is Gulshan Empire the Gulshan Group’s new project in Ghaziabad?
Yes — it is the group’s first Wave City / Ghaziabad project, after three decades of delivery in Noida and Greater Noida West (Dynasty, Botnia, Ikebana, Bellina, One29). The promoter is Gulshan Empire Estate LLP (LLPIN ACF-3850, inc. 7 Feb 2024), an entity of the Gulshan Group. See also our Gulshan builder profile.
Where is Gulshan Empire located?
Plot GH-2B, Sector 1, Oak Wood Enclave, Wave City, Ghaziabad, UP 201015 — inside the ~4,200-acre Wave City township with direct NH-24 (NH-9) / Delhi–Meerut Expressway frontage. The Eastern Peripheral Expressway interchange is at nearby Dasna.
What is the price of Gulshan Empire?
Indicative pre-launch pricing: 3 BHK + SR (2,075 sq ft) from ~₹1.98 Cr* and 4 BHK + SR (2,750 sq ft) from ~₹2.62 Cr* at ~₹10,500/sq ft base, plus PLC, floor-rise, other charges and GST — the dated sheet with every rate comes from our desk on WhatsApp, in writing. These are indicative figures, not RERA-published prices. Limited early-bird pricing on select units — ask Vidit for the current EOI rate. Itemized breakdown: gulshansempire.com/gulshan-empire-price/.
Does Gulshan Empire have a 2 BHK?
No. Empire offers only two configurations — 3 BHK + SR (2,075 sq ft) and 4 BHK + SR (2,750 sq ft). Areas are super/saleable; the 3 BHK RERA carpet is approx. 1,142 sq ft per the RERA mirror — verify on the portal.
What is the RERA number of Gulshan Empire?
UPRERAPRJ166511/05/2026 (as filed by the developer); promoter UP-RERA ID UPRERAPRM435155. Verify at up-rera.in. Step-by-step walkthrough: gulshansempire.com/gulshan-empire-rera/.
What is the possession date of Gulshan Empire?
Expected possession December 2030 (tentative); the RERA-filed completion date is 12 February 2031. Plan to the RERA filing, not verbal promises — no delivery timeline is guaranteed at pre-launch.
Is Wave City Ghaziabad a good place to buy in 2026?
Wave City is one of east NCR’s most infrastructure-backed corridors: ~4,200-acre IGBC pre-certified Platinum township, operational CBSE schools (DPS Wave City in-township), Pacific Mall ~6 km, direct NH-24/DME frontage, and the fully operational Namo Bharat RRTS ~8–10 km. Corridor average rate was ~₹8,027/sq ft in Mar 2026 (SquareYards). See our Ghaziabad city guide and the Wave City deep-dive.
Is M3M or Godrej launching in Wave City?
As of mid-2026, no. “M3M Wave City” and “Godrej Wave City” circulate as rumours, but neither is a RERA-registered Ghaziabad project — M3M has no Ghaziabad filing, and “Jade County” is a County Group project at Sector 8. Verification-first analysis: the M3M rumour, checked.
Is Gulshan Group reliable?
The group has a 1989 lineage and roughly ten delivered projects, including IGBC Platinum-rated Dynasty in Noida. Our standing advice: anchor trust to the RERA filing, the escrow account, and the location — never to delivery promises. Full builder profile: vidastu.com/builder/gulshan.
Gulshan Empire vs Gulshan Dynasty — what is the difference?
Gulshan Dynasty is a delivered IGBC Platinum-rated project in the Noida / Greater Noida West belt. Gulshan Empire is the Gulshan Group’s new pre-launch project at Wave City, Ghaziabad — a different city, a different part of the map, and a different buyer horizon (declared completion Dec 2030 tentative / RERA-filed Feb 2031). They share the same developer group; they are not directly comparable as they serve different location needs. If you need possession before 2030 or prefer the Noida side, Dynasty resale is worth exploring. If you want a new-launch unit on the NH-24 / Wave City corridor with a 5–7 year outlook, Empire is the current new-launch option.
What amenities does Gulshan Empire offer?
Gulshan Empire’s official club and amenity specifications were not published on the UP-RERA portal at the time of this review — Vidastu does not publish unverified amenity lists. To get the confirmed list: (1) check the RERA filing at up-rera.in under UPRERAPRJ166511/05/2026, or (2) request the developer brochure (which lists proposed amenities) via gulshansempire.com. Only amenities in the RERA-registered plan are contractually binding.
Can NRIs buy Gulshan Empire?
Yes — residential purchase is permitted under FEMA without RBI approval. Pay via NRE/NRO accounts or an NRI home loan (~70–80% LTV), and complete booking/registry remotely via registered Power of Attorney. Tax/TDS: consult your CA. Full guide: gulshansempire.com.
How do I book Gulshan Empire through Vidastu?
(1) WhatsApp (+91 98114 05300) with your configuration and timeline; (2) we send the current EOI rate, cost sheet and arrange a site visit; (3) all EOI/booking payments go only to the developer’s official account. Vidastu Advisory is a UP-RERA registered agent (UPRERAAGT000309/01/2026); our role and brokerage are disclosed in writing.
Is gulshansempire.com the official Gulshan Empire website?
No, and it says so prominently. gulshansempire.com is an independent resource site by Vidastu Advisory, a UP-RERA registered channel partner (UPRERAAGT000309/01/2026). It is not the developer and not the official Gulshan Group website. It exists because buyers deserve itemized pricing, RERA verification steps and honest FAQs, which is also why we link it from this review. How booking through a UP-RERA registered agent works.
Is Gulshan Empire the same as Wave City's EWS/LIG flats or Veridia?
No. Gulshan Empire is a luxury 3 & 4 BHK + SR project (2,075-2,750 sq ft) by the Gulshan Group. EWS/LIG affordable-housing allotments and any other named Wave City project (e.g. Veridia) are separate developments by other developers or authorities inside the same ~4,200-acre Wave City township — Vidastu has no channel-partner relationship or verified facts for those, and we don't quote prices or schemes we haven't verified. For Gulshan Empire pricing, configurations or booking, WhatsApp us directly; for any other Wave City project, verify RERA registration and pricing with that project's own authorised channel before paying anything.
Gulshan Empire Wave City mein flat ka price kya hai?
3 BHK + SR (2,075 sq ft) ki indicative pre-launch price ~₹1.98 Cr* se shuru hoti hai, aur 4 BHK + SR (2,750 sq ft) ~₹2.62 Cr* se — base rate ~₹10,500/sq ft, uske upar PLC, floor-rise, other charges aur GST alag lagte hain — har rate ke saath dated sheet hamare desk se WhatsApp par, likhit mein aati hai. Yeh figures indicative hain, RERA-published prices nahi. Current EOI rate ke liye Vidit ko WhatsApp kar dijiye — +91 98114 05300.

Deeper reading

Gulshan Empire — deeper reading.

The dedicated resource site carries the deepest Gulshan Empire coverage available:

Buyer’s brief

Buying in Wave City, Ghaziabad?

Free buyer’s brief · apartment, plot, or turnkey build

Whether you’re in India or an NRI abroad: local rate history, the FEMA rules for NRIs/OCIs, and how to buy or build remotely — every figure sourced and dated, no projections. We’ll send the 1-page brief and answer your questions.

UP-RERA agent UPRERAAGT000309/01/2026 · our sales desk advises & is a channel partner, not the developer · not investment advice · past performance is not a guarantee, values can fall · consult your CA/FEMA advisor.

Talk to the desk

Considering Gulshan Empire? Talk to Vidit first.

Same-day Wave City site visits, the current EOI rate in writing, RERA documentation review — and an honest read on whether Empire beats Gaur, SKA Divine or a Yamuna Expressway alternative for your goal.

Call the desk · +91 98114 05300

Or leave your number below — Vidit calls back personally.

No call-centre — the desk that does the work calls you back.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.