Builder Profile · Independent Coverage

Gulshan Group, and its new project at Wave City, Ghaziabad.

Building on the Noida belt since 1989 — longer than most. In 2026 the group crossed into Ghaziabad with Gulshan Empire at Wave City. We run active, independent coverage of Gulshan’s projects: Empire, Dynasty, Botnia, Ikebana, Bellina, One29.

Gulshan Group Founded 1989 · Gulshan Nagpal Vidastu status: Active coverage

1989
Founded · Gulshan Nagpal
~10
Projects delivered
Noida · Greater Noida West · Ghaziabad
In our coverage corridor
Active coverage
Vidastu status on Gulshan

About the group

Noida since 1989. Ghaziabad since 2026.

The Gulshan Group, founded by Gulshan Nagpal in 1989, has built its record across Noida (Bellina, Botnia, One29) and Greater Noida West (Ikebana, Vivante). The group’s positioning runs mid-premium to luxury, with amenity-rich addresses at competitive prices — Gulshan Dynasty (Sector 144) is IGBC Platinum-rated.

In 2026 the group made its Ghaziabad debut: Gulshan Empire at Wave City, a pre-launch luxury project via Gulshan Empire Estate LLP — 3 & 4 BHK + SR only, project RERA UPRERAPRJ166511/05/2026 (as filed by the developer). Buyers frequently compare Gulshan to Mahagun and Prateek — a comparison we run often on live calls.

The Ghaziabad project is the only one on this page with a dedicated resource site of its own: the itemized pricing, floor plans, RERA walkthrough and buyer FAQ for Gulshan Empire are published there by our sister brand Vidastu Advisory, an authorised channel partner and not the developer.

Dynasty is the premium new launch; Botnia is ready/near-ready in the same sector — different stages of the same group’s pipeline, and very different price points.

Official developer site: gulshanhomz.com · This is an authorised channel partnery read by Vidastu Advisory — Vidastu did not build and is not building any Gulshan project.

In our corridor

Gulshan projects we actively cover.

Every project below sits inside our coverage — the ones we get calls about, and the ones our clients actually buy into.

Gulshan Group · project coverage
ProjectLocationStage / segmentNotes
Gulshan Empire New · 2026 Wave City, NH-24, Ghaziabad Pre-launch · luxury 3 & 4 BHK + SR only, from ~₹1.98 Cr*. The group’s Ghaziabad debut, via Gulshan Empire Estate LLP.
Gulshan Dynasty Sector 144, Noida Premium new launch IGBC Platinum-rated. ₹3.5 Cr+ band.
Gulshan Botnia Sector 144, Noida Ready / near-ready Same sector as Dynasty, earlier stage of the group’s pipeline. ₹1.8–2.5 Cr band. Active resale market.
Gulshan Ikebana Greater Noida West Delivered Mid-premium.
Gulshan Bellina Noida Established Mid-segment. Active resale market.
Gulshan One29 Noida Established Mid-segment.
Gulshan Vivante Greater Noida West Delivered Mid-premium.

Gulshan Empire — the current launch, by configuration.

  • 3 BHK+SR2,075 sq ft · from ~₹1.98 Cr*
  • 4 BHK+SR2,750 sq ft · from ~₹2.62 Cr*
  • EntityGulshan Empire Estate LLP
  • Project RERAUPRERAPRJ166511/05/2026 (as filed)

*Prices as filed/quoted by the developer at pre-launch; confirm current figures before booking. RERA number as filed by the developer — verify on the UP RERA portal before any payment.

Configuration-level detail — the 3 BHK + SR and 4 BHK + SR layouts side by side — is set out on the floor-plan page for Gulshan Empire.

Why go through the desk

An independent read before you sign, not after.

Vidastu Advisory · UP-RERA agent

We check the paperwork.

The ₹11,000 audit covers Gulshan-specific escrow accounting and RERA filings — project RERA number, escrow compliance, and what’s actually sanctioned versus marketed.

  • ✓ Gulshan-vs-Mahagun-vs-Prateek comparison, run on request
  • ✓ Escrow & RERA-filing review, Gulshan-specific
  • ✓ Independent read — we are not the seller
Ask for the audit
Sector 144 + Greater Noida West specialty

We know the resale market.

Active secondary markets in Botnia and Bellina — we facilitate resale on both, with a straight read on what a unit is actually worth this month.

  • → Resale facilitation in Botnia, Bellina
  • → Weekly comparison calls on Gulshan pricing
  • → Same-day site walk on request
Ask the desk on WhatsApp

Common questions

On Gulshan, answered straight.

What is the Gulshan Group’s new project in 2026?

Gulshan Empire at Wave City, Ghaziabad — the group’s first Ghaziabad project, by Gulshan Empire Estate LLP (an entity of the Gulshan Group). Pre-launch luxury: 3 BHK + SR (2,075 sq ft, from ~₹1.98 Cr*) and 4 BHK + SR (2,750 sq ft, from ~₹2.62 Cr*), project RERA UPRERAPRJ166511/05/2026 (as filed by the developer). Read our review →

Gulshan Dynasty vs Gulshan Botnia — what’s the difference?

Dynasty is the premium new launch; Botnia is ready/near-ready in the same sector. Different stages of the project lifecycle and different price points — Dynasty ₹3.5 Cr+ versus Botnia ₹1.8–2.5 Cr.

Does Vidastu build Gulshan’s projects?

No. Vidastu Developers Pvt. Ltd. builds turnkey homes on clients’ own plots — a separate, unrelated line of work. This profile is an authorised channel partnery read by Vidastu Advisory (UP-RERA Agent UPRERAAGT000309/01/2026) on Gulshan’s projects; it is not a construction relationship with the Gulshan Group.

Talk to the desk

Want an independent read on a Gulshan project?

Empire, Dynasty, Botnia, Ikebana, Bellina or One29 — tell us which one, and you get a straight read on pricing, paperwork and fit, before you sign anything.

Call the desk · +91 98114 05300

Active buyer advocate · Sector 144 + Greater Noida West specialty · UP-RERA Agent UPRERAAGT000309/01/2026.

No call-centre — the desk that covers Gulshan calls you back.

By submitting you consent to be contacted about your enquiry. Nothing is auto-sent; no payment is ever requested online.

On the register: Gulshan Avante is registered as UPRERAPRJ860880 with a RERA declared completion date of 30 April 2028, read field by field on the Gulshan Avante register read.